This project included the installation of 250 KW and 400 KW natural gas generators at Water Plant No. 1 and Water Well No. 5. Construction also included electrical modifications, concrete slabs, coordination for natural gas service, and site restoration.
Pecan Grove MUD Installation of Emergency GeneratorsOdyssey Engineering Group2024-05-28T21:55:35-05:00